Design Review Board
Level 2: Major alteration of an existing building/structure
Level 2: Addition to an existing building/structure
4-C-16-DT
This case has been appealed
Staff Recommendation
APPROVE Certificate 4-C-16-DT as determined appropriate by the Downtown Design Review Board.Case File
Location 620 S Gay St
Applicant Request
The adaptive reuse of the former KUB Building (620 S. Gay Street) in Downtown Knoxville into the headquarters for the Tombras Group. The proposed scope of work includes alterations to the building envelope to increase interior daylighting and improve the energy efficiency of the building as well as the addition of a new rooftop structure. The primary material palette consists of a rainscreen panel system and brick veneer. A metal panel system provides an accent to these materials. This material palette relates to the downtown context. A new roof addition replaces the former mechanical penthouse and allows access to a new roof deck. Mechanical screening will be provided at all roof mounted equipment.
Materials:
1) New brick veneer - floors 2 and 3 of the 3-story building, 1st and basement floors of the 4-story building
2) Rainscreen panel system - floors 2, 3 & 4 and rooftop addition of the 4-story building (Gay St. and Church Ave. elevations). The rainscreen panels are made of a concrete and fiber mix that is a dense material, and will have slight color variation from panel to panel so as to not have an exact color consistency.
3) Storefront and windows - clear glass, aluminum framing
4) Metal panels system with concealed fasteners - adjacent to and recessed with some upper story windows, within the recessed entry of the 3-story building, adjacent to the basement level entry (Church Ave. elevation), canopies, metal reveal trim (vertical element on 3-story building and horizontal element between floors 1 & 2 on the Church Ave. elevation), and mechanical screen on top of the addition on the 4-story building
5) Metal guardrail - rooftop decks
6) Wood veneer - within the recessed entry of the 4-story building, on the underside of the roof on the rooftop addition of the 4-story building
Signs: All wall signs are halo lit
1) Basement level: 1' x 8' wall sign
2) 1st floor: 1' x 8' wall sign, window signs for corner space to be no more than 30% of window area (Gay St. and Church Ave. elevations)
3) 4th floor: 2' x 16' wall signs on both the Gay St. and Church Ave. elevations (near this building corner)
4) 5th floor (rooftop addition): 2' x 16' wall signs on both the east and north elevations
Materials:
1) New brick veneer - floors 2 and 3 of the 3-story building, 1st and basement floors of the 4-story building
2) Rainscreen panel system - floors 2, 3 & 4 and rooftop addition of the 4-story building (Gay St. and Church Ave. elevations). The rainscreen panels are made of a concrete and fiber mix that is a dense material, and will have slight color variation from panel to panel so as to not have an exact color consistency.
3) Storefront and windows - clear glass, aluminum framing
4) Metal panels system with concealed fasteners - adjacent to and recessed with some upper story windows, within the recessed entry of the 3-story building, adjacent to the basement level entry (Church Ave. elevation), canopies, metal reveal trim (vertical element on 3-story building and horizontal element between floors 1 & 2 on the Church Ave. elevation), and mechanical screen on top of the addition on the 4-story building
5) Metal guardrail - rooftop decks
6) Wood veneer - within the recessed entry of the 4-story building, on the underside of the roof on the rooftop addition of the 4-story building
Signs: All wall signs are halo lit
1) Basement level: 1' x 8' wall sign
2) 1st floor: 1' x 8' wall sign, window signs for corner space to be no more than 30% of window area (Gay St. and Church Ave. elevations)
3) 4th floor: 2' x 16' wall signs on both the Gay St. and Church Ave. elevations (near this building corner)
4) 5th floor (rooftop addition): 2' x 16' wall signs on both the east and north elevations
Staff Comments
The former KUB Building, which includes both the current 4-story green brick building and the adjacent 3-story brick building, are NOT within the Gay Street Commercial (National Register) Historic District. However, there are contributing structures within this national register historic district immediately to the north (Arcade Building) and the east (Keyhole Building). There are two distinct building facades along Gay Street but the buildings have been heavily modified over the years, into three sections with different construction types that complicate the configuration of the buildings. For instance, the structural system for the rounded building corner of the 1950's building remains within the current squared off building. This makes installing windows near the corner of the building difficult.
The guidelines recommend that new building materials should relate to the scale, durability, color, and texture of the predominate building materials in the area. To accomplish this the guidelines recommend using complimentary materials and elements, especially next to historic buildings, and dividing larger buildings into 'modules' similar to traditional downtown buildings with a recognizable base, middle, and top. While the subject buildings are shorter than most historic buildings along Gay Street and would suggest that dividing the building into 'modules' may not be necessary, it is taller than the historic buildings that are immediately adjacent. The brick veneer is a complimentary material to most buildings downtown, however, to adjacent structures have stone facades. The rainscreen is a solid material similar to stone but is a modern interpretation and installation method of the material. The guidelines also encourage ground floor uses that draw walk-in traffic and include largely transparent and consistent rhythm of entrances and windows along sidewalk, which this redevelopment accomplishes.
This proposal requires the board to interpret several recommendations of the guidelines to determine if it is appropriate as presented. In doing so, in addition to the recommendation of the design guidelines the board should consider the objectives of the overlay zone that the design review board shall work to realize (particularly 1, 3, & 6):
1. Promote downtown as a place for a viable mix of commercial, office, civic and residential uses, including street level development that creates a pedestrian-friendly environment.
2. Create quality publicly-oriented spaces, including streets, pedestrian ways, parks and squares that are safe and beautiful.
3. Create harmony in architectural and landscape architectural elements to provide a pleasing environment and continuous commerce and interest along sidewalks.
4. Create efficient processes for the review and approval of downtown projects.
5. Establish a means for design review for public improvements and building development and renovation to protect overall downtown investments.
6. Foster new development that complements adjacent historic resources.
7. Provide for the development of areas of special character, including the older grid street district (including such streets as Gay and Market streets and Clinch and Cumberland avenues), the Warehouse District (the Jackson-Central vicinity) and areas that are characterized by boulevard-like streets (such as sites along Summit Hill Drive and Henley Street).
Applicable guidelines:
Section 1.B.1 (BUILDING MASS, SCALE AND FORM) Building form should be consistent with the character of downtown as an urban setting and should reinforce the pedestrian activity at the street level. Creating pedestrian-scale buildings, especially at street level, can reduce the perceived mass of buildings... There is still a need for buildings that respond to pedestrians. The use of 'human-scale' design elements is necessary to accomplish this. Human-scale design elements are details and shapes that are sized to be proportional to the human body, such as, upper story setbacks, covered entries, and window size and placement.
1d. Divide larger buildings into 'modules' that are similar in scale to traditional downtown buildings. Buildings should be designed with a recognizable base, middle, and top on all exposed elevations.
Section 1.B.3. (BUILDING MATERIALS) New building materials should relate to the scale, durability, color, and texture of the predominate building materials in the area.
3a. Use complimentary materials and elements, especially next to historic buildings.
Section 1.B.4. (ARCHITECTURAL CHARACTER) Buildings should be visually interesting to invite exploration by pedestrians. A building should express human scale through materials and forms that were seen traditionally. This is important because buildings are experienced at close proximity by the pedestrian.
4a. Encourage first floor uses that draw walk-in traffic; businesses that do not require pedestrian traffic should be located on other floors.
4b. Enhance pedestrian interest in commercial and office buildings by creating a largely transparent and consistent rhythm of entrances and windows.
4c. Scale first floor signs to pedestrians.
4d. Differentiate the architectural features of ground floors from upper floors with traditional considerations such as show-windows, transoms, friezes, and sign boards.
4e. Design top floors to enhance the skyline of the block through cornices and details that are harmonious with adjacent architecture.
4f. Encourage the use of 'green roofs' and other sustainable practices, while minimizing the visual impact from the street.
Section 1.B.5. (GROUND FLOOR DOORS AND WINDOWS) Entrances and ground floor windows should foster pedestrian comfort, safety and orientation. Not every building in downtown needs to have the same window or entry designs; however, repeating the pattern of historic openings helps to reinforce the character of downtown, differentiating it from suburban areas.
5a. Use consistent rhythm of openings, windows, doorways, and entries.
5b. Orient primary front entrances to the main street; secondary entrances should be clearly defined and oriented to streets or alleys, as appropriate.
5c. Design entrances according to the proportions of the building's height and width.
5d. Consider corner entrances at the ends of blocks.
5e. All windows at the pedestrian level should be clear.
5f. Recess ground floor window frames and doors from the exterior building face to provide depth to the facade.
Section 1.B.7. (MECHANICAL EQUIPMENT AND SERVICE UTILITIES) Utilities can include telephone and electrical lines, ventilation systems, gas meters, air conditioners, fire protection, telecommunication and alarm systems. Adequate space for these utilities should be planned in a project from the outset and they should be designed such that their visual and noise impacts are minimized.
7a. Minimize the visual impact of mechanical equipment through screens or recessed/low-profile equipment.
7b. Do not locate units on a primary facade.
7c. Screen rooftop vents, heating/cooling units and related utilities with parapet walls or other screens. Consider sound-buffering of the units as part of the design.
7d. Locate utility connections and service boxes on secondary walls.
The guidelines recommend that new building materials should relate to the scale, durability, color, and texture of the predominate building materials in the area. To accomplish this the guidelines recommend using complimentary materials and elements, especially next to historic buildings, and dividing larger buildings into 'modules' similar to traditional downtown buildings with a recognizable base, middle, and top. While the subject buildings are shorter than most historic buildings along Gay Street and would suggest that dividing the building into 'modules' may not be necessary, it is taller than the historic buildings that are immediately adjacent. The brick veneer is a complimentary material to most buildings downtown, however, to adjacent structures have stone facades. The rainscreen is a solid material similar to stone but is a modern interpretation and installation method of the material. The guidelines also encourage ground floor uses that draw walk-in traffic and include largely transparent and consistent rhythm of entrances and windows along sidewalk, which this redevelopment accomplishes.
This proposal requires the board to interpret several recommendations of the guidelines to determine if it is appropriate as presented. In doing so, in addition to the recommendation of the design guidelines the board should consider the objectives of the overlay zone that the design review board shall work to realize (particularly 1, 3, & 6):
1. Promote downtown as a place for a viable mix of commercial, office, civic and residential uses, including street level development that creates a pedestrian-friendly environment.
2. Create quality publicly-oriented spaces, including streets, pedestrian ways, parks and squares that are safe and beautiful.
3. Create harmony in architectural and landscape architectural elements to provide a pleasing environment and continuous commerce and interest along sidewalks.
4. Create efficient processes for the review and approval of downtown projects.
5. Establish a means for design review for public improvements and building development and renovation to protect overall downtown investments.
6. Foster new development that complements adjacent historic resources.
7. Provide for the development of areas of special character, including the older grid street district (including such streets as Gay and Market streets and Clinch and Cumberland avenues), the Warehouse District (the Jackson-Central vicinity) and areas that are characterized by boulevard-like streets (such as sites along Summit Hill Drive and Henley Street).
Applicable guidelines:
Section 1.B.1 (BUILDING MASS, SCALE AND FORM) Building form should be consistent with the character of downtown as an urban setting and should reinforce the pedestrian activity at the street level. Creating pedestrian-scale buildings, especially at street level, can reduce the perceived mass of buildings... There is still a need for buildings that respond to pedestrians. The use of 'human-scale' design elements is necessary to accomplish this. Human-scale design elements are details and shapes that are sized to be proportional to the human body, such as, upper story setbacks, covered entries, and window size and placement.
1d. Divide larger buildings into 'modules' that are similar in scale to traditional downtown buildings. Buildings should be designed with a recognizable base, middle, and top on all exposed elevations.
Section 1.B.3. (BUILDING MATERIALS) New building materials should relate to the scale, durability, color, and texture of the predominate building materials in the area.
3a. Use complimentary materials and elements, especially next to historic buildings.
Section 1.B.4. (ARCHITECTURAL CHARACTER) Buildings should be visually interesting to invite exploration by pedestrians. A building should express human scale through materials and forms that were seen traditionally. This is important because buildings are experienced at close proximity by the pedestrian.
4a. Encourage first floor uses that draw walk-in traffic; businesses that do not require pedestrian traffic should be located on other floors.
4b. Enhance pedestrian interest in commercial and office buildings by creating a largely transparent and consistent rhythm of entrances and windows.
4c. Scale first floor signs to pedestrians.
4d. Differentiate the architectural features of ground floors from upper floors with traditional considerations such as show-windows, transoms, friezes, and sign boards.
4e. Design top floors to enhance the skyline of the block through cornices and details that are harmonious with adjacent architecture.
4f. Encourage the use of 'green roofs' and other sustainable practices, while minimizing the visual impact from the street.
Section 1.B.5. (GROUND FLOOR DOORS AND WINDOWS) Entrances and ground floor windows should foster pedestrian comfort, safety and orientation. Not every building in downtown needs to have the same window or entry designs; however, repeating the pattern of historic openings helps to reinforce the character of downtown, differentiating it from suburban areas.
5a. Use consistent rhythm of openings, windows, doorways, and entries.
5b. Orient primary front entrances to the main street; secondary entrances should be clearly defined and oriented to streets or alleys, as appropriate.
5c. Design entrances according to the proportions of the building's height and width.
5d. Consider corner entrances at the ends of blocks.
5e. All windows at the pedestrian level should be clear.
5f. Recess ground floor window frames and doors from the exterior building face to provide depth to the facade.
Section 1.B.7. (MECHANICAL EQUIPMENT AND SERVICE UTILITIES) Utilities can include telephone and electrical lines, ventilation systems, gas meters, air conditioners, fire protection, telecommunication and alarm systems. Adequate space for these utilities should be planned in a project from the outset and they should be designed such that their visual and noise impacts are minimized.
7a. Minimize the visual impact of mechanical equipment through screens or recessed/low-profile equipment.
7b. Do not locate units on a primary facade.
7c. Screen rooftop vents, heating/cooling units and related utilities with parapet walls or other screens. Consider sound-buffering of the units as part of the design.
7d. Locate utility connections and service boxes on secondary walls.
Case History
- September 13, 2007
Date Filed
- September 25, 2007
Date Filed
- October 8, 2007
Date Filed
- October 17, 2007
Date Filed
- November 6, 2007
Date Filed
- November 7, 2007
Date Filed
- November 26, 2007
- December 4, 2007
Date Filed
- December 6, 2007
Date Filed
- December 10, 2007
Date Filed
- December 19, 2007
- January 3, 2008
Date Filed
- January 8, 2008
Date Filed
- January 16, 2008
- January 29, 2008
Date Filed
- February 1, 2008
Date Filed
- February 4, 2008
Date Filed
- February 8, 2008
Date Filed
- February 13, 2008
Date Filed
- February 20, 2008
- February 29, 2008
Date Filed
- March 19, 2008
- March 27, 2008
Date Filed
- April 4, 2008
Date Filed
- April 16, 2008
- October 15, 2008
Date Filed
- October 21, 2008
Date Filed
- November 14, 2008
Date Filed
- December 5, 2008
Date Filed
- December 15, 2008
- January 8, 2009
Date Filed
- November 2, 2009
Date Filed
- November 5, 2009
Date Filed
- November 6, 2009
Date Filed
- November 13, 2009
Date Filed
- November 18, 2009
- November 25, 2009
Date Filed
- December 2, 2009
Date Filed
- December 7, 2009
Date Filed
- December 16, 2009
- January 5, 2010
Date Filed
- January 20, 2010
- January 25, 2010
Date Filed
Appealed
- January 26, 2010
Date Filed
- February 5, 2010
Date Filed
- February 17, 2010
- March 9, 2010
Date Filed
- March 12, 2010
Date Filed
- March 17, 2010
- April 5, 2010
Date Filed
- April 7, 2010
Date Filed
- April 15, 2010
- April 21, 2010
- May 19, 2010
- September 23, 2010
Date Filed
- September 28, 2010
Date Filed
- September 30, 2010
Date Filed
- October 1, 2010
Date Filed
- October 20, 2010
- November 22, 2010
Date Filed
- November 23, 2010
- December 30, 2010
Date Filed
- January 28, 2011
Date Filed
- February 3, 2011
Date Filed
- February 7, 2011
- February 16, 2011
- March 31, 2011
Date Filed
- April 11, 2011
Date Filed
- April 20, 2011
- September 16, 2011
Date Filed
- September 26, 2011
Date Filed
- September 30, 2011
Date Filed
- October 3, 2011
Date Filed
- October 11, 2011
Date Filed
- October 12, 2011
Date Filed
- October 19, 2011
- October 24, 2011
Date Filed
- November 2, 2011
Date Filed
- November 7, 2011
Date Filed
- November 16, 2011
- February 6, 2012
Date Filed
- February 15, 2012
- February 16, 2012
Date Filed
- February 17, 2012
- February 28, 2012
Date Filed
- March 1, 2012
Date Filed
- March 9, 2012
Date Filed
- March 12, 2012
Date Filed
- March 14, 2012
- March 21, 2012
- April 18, 2012
- September 20, 2012
Date Filed
- September 26, 2012
Date Filed
- October 3, 2012
Date Filed
- October 4, 2012
- October 12, 2012
Date Filed
- October 17, 2012
- November 1, 2012
Date Filed
- November 5, 2012
Date Filed
- November 14, 2012
- November 29, 2012
Date Filed
- December 4, 2012
Date Filed
- December 5, 2012
Date Filed
- December 10, 2012
- December 19, 2012
- February 4, 2013
Date Filed
- February 12, 2013
Date Filed
- February 20, 2013
- February 28, 2013
Date Filed
- March 5, 2013
Date Filed
- March 7, 2013
Date Filed
- March 20, 2013
- March 26, 2013
Date Filed
- March 28, 2013
Date Filed
- April 17, 2013
- May 15, 2013
- May 17, 2013
Appealed
- September 27, 2013
Date Filed
- October 4, 2013
Date Filed
- October 9, 2013
Date Filed
- October 16, 2013
- October 21, 2013
Date Filed
- October 30, 2013
Date Filed
- November 7, 2013
Date Filed
- November 15, 2013
Date Filed
- November 20, 2013
- November 25, 2013
- November 27, 2013
Date Filed
- December 5, 2013
Date Filed
- December 18, 2013
- January 10, 2014
Date Filed
- January 22, 2014
Date Filed
- January 23, 2014
- January 27, 2014
Date Filed
- January 31, 2014
Date Filed
- February 19, 2014
- February 28, 2014
Date Filed
- March 2, 2014
Date Filed
- March 19, 2014
- April 15, 2014
Date Filed
- September 16, 2014
Date Filed
- September 25, 2014
Date Filed
- October 6, 2014
Date Filed
- October 7, 2014
- October 15, 2014
- October 27, 2014
Date Filed
- October 31, 2014
Date Filed
- November 7, 2014
Date Filed
- November 10, 2014
Date Filed
- November 14, 2014
Date Filed
- November 19, 2014
- November 26, 2014
Date Filed
- December 3, 2014
Date Filed
- December 5, 2014
Date Filed
- December 10, 2014
Date Filed
- December 17, 2014
- January 8, 2015
Date Filed
- January 21, 2015
- January 22, 2015
Date Filed
- January 30, 2015
Date Filed
- February 6, 2015
Date Filed
- February 18, 2015
- March 2, 2015
Date Filed
- March 13, 2015
Date Filed
- March 18, 2015
- March 31, 2015
Date Filed
- April 15, 2015
- July 15, 2015
- October 1, 2015
Date Filed
- October 2, 2015
Date Filed
- October 9, 2015
Date Filed
- October 16, 2015
Date Filed
- October 21, 2015
- October 22, 2015
Date Filed
- October 26, 2015
Date Filed
- October 29, 2015
Date Filed
- October 30, 2015
Date Filed
- November 18, 2015
- November 19, 2015
Date Filed
- November 25, 2015
Date Filed
- November 30, 2015
Date Filed
- December 2, 2015
- December 3, 2015
Date Filed
- December 16, 2015
- December 17, 2015
Date Filed
- December 23, 2015
- December 30, 2015
Date Filed
- February 5, 2016
Date Filed
- February 10, 2016
Date Filed
- February 16, 2016
Date Filed
- February 17, 2016
- February 26, 2016
Date Filed
- March 16, 2016
- March 23, 2016
Date Filed
- April 1, 2016
Date Filed
- April 20, 2016
- July 20, 2016
- September 26, 2016
Date Filed
- October 5, 2016
Date Filed
- October 6, 2016
Date Filed
- October 19, 2016
- November 3, 2016
Date Filed
- November 9, 2016
Date Filed
- November 17, 2016
- December 14, 2016
- December 29, 2016
Date Filed
- January 6, 2017
Date Filed
- January 13, 2017
Date Filed
- January 18, 2017
- January 27, 2017
Date Filed
- February 1, 2017
- February 15, 2017
- February 23, 2017
Date Filed
- February 27, 2017
Date Filed
- March 13, 2017
Date Filed
- March 15, 2017
- March 31, 2017
Date Filed
- April 19, 2017
- September 28, 2017
Date Filed
- October 18, 2017
- October 23, 2017
Date Filed
- October 30, 2017
Date Filed
- November 15, 2017
- November 16, 2017
Date Filed
- November 27, 2017
Date Filed
- November 30, 2017
Date Filed
- December 4, 2017
Date Filed
- December 5, 2017
Date Filed
- December 20, 2017
- December 28, 2017
Date Filed
- December 29, 2017
Date Filed
- January 9, 2018
Date Filed
- January 17, 2018
Date Filed
- January 18, 2018
Date Filed
- January 19, 2018
- January 23, 2018
Date Filed
- February 9, 2018
- February 21, 2018
Date Filed
- March 2, 2018
Date Filed
- March 6, 2018
- March 21, 2018
- September 24, 2018
Date Filed
- October 5, 2018
Date Filed
- October 12, 2018
Date Filed
- October 15, 2018
Date Filed
- October 17, 2018
- October 19, 2018
- October 26, 2018
- November 5, 2018
Date Filed
- November 14, 2018
- December 4, 2018
Date Filed
- December 17, 2018
Date Filed
- December 19, 2018
- December 20, 2018
Date Filed
- January 4, 2019
Date Filed
- January 16, 2019
- January 23, 2019
Date Filed
- January 30, 2019
Date Filed
- January 31, 2019
Date Filed
- February 7, 2019
- February 20, 2019
Date Filed
- February 21, 2019
- March 1, 2019
Date Filed
- March 11, 2019
Date Filed
- March 20, 2019
- March 22, 2019
Date Filed
- March 25, 2019
Date Filed
- April 17, 2019
- September 27, 2019
Date Filed
- October 16, 2019
- October 22, 2019
Date Filed
- November 1, 2019
Date Filed
- November 13, 2019
Date Filed
- November 18, 2019
Date Filed
- November 19, 2019
Date Filed
- November 20, 2019
- November 21, 2019
- December 18, 2019
- January 2, 2020
Date Filed
- January 6, 2020
- January 22, 2020
Date Filed
- January 30, 2020
Date Filed
- January 31, 2020
Date Filed
- February 19, 2020
- February 25, 2020
Date Filed
- February 27, 2020
Date Filed
- February 28, 2020
Date Filed
- March 13, 2020
Date Filed
- March 18, 2020
- March 31, 2020
Date Filed
- April 15, 2020
- September 9, 2020
Date Filed
- September 28, 2020
Date Filed
- October 5, 2020
Date Filed
- October 21, 2020
- October 26, 2020
Date Filed
- October 30, 2020
Date Filed
- November 18, 2020
Date Filed
- November 23, 2020
Date Filed
- November 30, 2020
Date Filed
- December 16, 2020
- December 28, 2020
Date Filed
- January 20, 2021
- February 1, 2021
Date Filed
- February 2, 2021
Date Filed
- February 5, 2021
Date Filed
- February 17, 2021
- March 2, 2021
Date Filed
- March 17, 2021
- April 5, 2021
Date Filed
- April 21, 2021
- October 5, 2021
Date Filed
- October 8, 2021
Date Filed
- October 20, 2021
- November 1, 2021
Date Filed
- November 17, 2021
- December 7, 2021
Date Filed
- December 15, 2021
- January 4, 2022
Date Filed
- January 19, 2022
- January 28, 2022
Date Filed
- February 16, 2022
- February 22, 2022
Date Filed
- February 25, 2022
Date Filed
- March 1, 2022
Date Filed
- March 10, 2022
Date Filed
- March 16, 2022
- March 25, 2022
Date Filed
- April 20, 2022
- September 19, 2022
Date Filed
- September 21, 2022
- September 30, 2022
Date Filed
- October 19, 2022
- October 28, 2022
Date Filed
- October 31, 2022
Date Filed
- November 16, 2022
- November 23, 2022
Date Filed
- December 2, 2022
Date Filed
- December 7, 2022
Date Filed
- December 21, 2022
- January 3, 2023
Date Filed
- January 18, 2023
- February 22, 2023
Date Filed
- February 24, 2023
Date Filed
- March 15, 2023
- March 31, 2023
Date Filed
- April 19, 2023
- September 20, 2023
Date Filed
- October 2, 2023
Date Filed
- October 18, 2023
- October 24, 2023
Date Filed
- November 15, 2023
- December 4, 2023
Date Filed
- December 20, 2023
- December 22, 2023
Date Filed
- January 23, 2024
Date Filed
- January 26, 2024
Date Filed
- February 2, 2024
Date Filed
- February 9, 2024
Date Filed
- February 21, 2024
- February 27, 2024
Date Filed
- March 1, 2024
Date Filed
- March 20, 2024
Date Filed
- March 29, 2024
Date Filed
- April 17, 2024
- September 16, 2024
Date Filed
- October 16, 2024
- October 18, 2024
Date Filed
- October 30, 2024
Date Filed
- November 1, 2024
Date Filed
- November 20, 2024
- November 21, 2024
Date Filed
- December 4, 2024
Date Filed
- December 18, 2024
- December 19, 2024
Date Filed
- January 15, 2025
- January 30, 2025
Date Filed
- February 19, 2025